Bell ARH-70 Arapaho

The Bell ARH-70 helicopter was developed for the US Army as a possible direct replacement to the successful but aged Kiowa Warrior series of light armed reconnaissance mounts. In an effort to keep production and acquisition costs down for the US Army, the project attempted to develop a product using existing yet proven components. The Bell ARH was essentially a militarized form of the Bell 407. The ARH-70 came from the US Army’s Armed Reconnaissance Helicopter (ARH) program after the official cancellation of the RAH-66 Comanche light attack helicopter. Initial production forms would have been given the designation of ARH-70A.

In December of 2004, the requirement was sent out by the US Army and interested parties responded with their proposals. Chief among the returns was the Bell Model 407 (billed as an upgraded OH-58 Kiowa Warrior) and a Boeing response. Bell eventually won out and was awarded the multi-billion dollar production contract on July 29th, 2005. The contract called for some 368 production examples and required two prototypes along with two preproduction samples, this later changed to require four pre-production examples instead.

First flight of a demonstrator ARH was achieved on June 3rd, 2005. Further flights ensued and ultimately included additional avionics, mission-specific systems and the selected Honeywell HTS900-2 series turboshaft engine. The engine was trialed only on demonstrators and on the ground to verify its base qualities to this point. After some program delays, the first true ARH-70 prototype (Prototype #2) went airborne on July 20th, 2006, less than one year since the awarding of the Army contract. Prototype #4 was of note for it was forced to make a crash landing at a gold course after suffering an engine failure, this recorded on February 21st, 2007. Though neither of the pilots was harmed in the crash, the airframe was deemed a complete loss and a setback for the ARH program.

Ultimately, delays and product costs soon crept up on the ARH-70. The US Army halted the project, giving Bell one month to get its act in order. For the interim, Bell used its own money to further develop the systems until the US Army agreed to pick up the project once again by the middle of 2007. The rising costs forced an automatic and direct DoD review of the program under the existing Nunn-McCurdy Act. In the 2008 Defense Budget, no money was deviated to furthering the ARH-70. A final attempt to offer the ARH-70 as an export product to help recover some cost fell to naught and the ARH-70 remained in limbo for the time being. At one point, it was expected that some 512 total systems could be purchased by the US military alone, the additional examples over the original agreed upon total being delivered for use by the Army National Guard to replace their aged AH-64 Apaches.

The ARH-70 program proved too much to be a viable option for the US Army, despite the mount reaching all required performance parameters. The Army Acquisition Executive Office for Aviation called for the DoD contract to be terminated in full. The US Department of Defense officially acknowledged the request and did not promote the multi-million dollar expenditure to the US Congress, effectively killing hope for Bell and their new little machine. By this time, a single ARH-70 example had nearly doubled in per-unit cost to an estimated $14.5 million USD. According to Bell, the contract was 53 percent complete at the time of its cancellation on October 16th, 2008, with some 1,500 test flight hours having been recorded.

Design of the ARH-70 followed suit with the OH-58 series family of light helicopters. The two-man crew was seated in a side-by-side arrangement well-forward in the fuselage. Each position featured redundant controls and large, transparent, bulging forward windshields offering excellent visibility. Each pilot maintained their own automobile-style doors, hinged at two points forward, for entry and exit into their respective cockpit seats. Optics and special mission equipment could be mounted externally under the chin portion of the fuselage. The passenger cabin was located directly behind the cockpit and accessed via side access doors. Weapon stub pylons emerged from the fuselage underside and could carry limited offensive munitions. Landing skids were affixed to either fuselage underside and supported at two fixed points. The single engine was fitted high atop the fuselage above and behind the crew cabin. Exhaust jettisoned upwards at the rear of the engine compartment. The engine drove a four-bladed main rotor and a two-bladed tail rotor. The empennage was raised at the rear of the crew cabin and engine compartment, capped by a tall vertical tail fin. Additional vertical fins were set along the sides of the tail system along horizontal planes. The tail rotor was set to face the portside of the aircraft.

Crew accommodations amounted to two pilots in the forward cockpit and up to six passengers in the main cabin.

Power for the ARH-70 was supplied from a single Honeywell HTS900-2 turboshaft engine of 970 shaft horsepower. This powerplant could supply the airframe a top speed of 161 miles per hour with a cruise speed of about 130 miles per hour. Her range was listed at 186 miles with a service ceiling equal to 20,000 feet. Empty weight registered at 2,598lbs with a maximum take-off weight equal to 5,000lbs.

As an armed reconnaissance helicopter and as in the OH-58D before it, the ARH-70 was intended to carry a rather modest arrangement of weaponry. Primary hitting power was to be supplied y a 1 x GAU-19 series 0.50 caliber Gatling gun fitted to an outboard pylon as well as Hydra 70 2.75-inch (70mm) rockets, also on an outboard pylon.

Although referred to in a few official media reports under the designation of ‘Arapaho’, this name was never officially assigned to the ARH-70 product.

Bell ARH-70A (Arapaho)
Engine: 1 x Honeywell HTS900-2 turboshaft, 970shp
Rotor: four-blade main rotor and two-blade tail rotor.
Length: 34.68ft (10.57m)
Height: 11.68ft (3.56m)
Empty Weight: 2,597lbs (1,178kg)
Maximum Take-Off Weight: 5,000lbs (2,268kg)
Maximum Speed: 161mph (259kmh; 140kts)
Maximum Range: 186miles (300km)
Service Ceiling: 20,000ft (6,096m)
Accommodation: 2 + 6
Hardpoints: 2

Bell 407

With the design definition launched in 1993, the Bell 407, developed from the 206L-4 offered wider cabin, 815 shp 250-C47B derated to 675 shp for takeoff and four main rotor blades. From the windscreen pillars the cabin swells outwards to a width 178 mm more than the LongRanger’s, not tapering in again until it meets the baggage compartment forward bulkhead. Aft of that it’s normal LongRanger, although with a different tail rotor system. The extra width is gained through curved door pillars and skins of carbon fibre composites. Cabin windows are greatly enlarged, coming down to the level of the windscreen and curving well up towards the cabin roof. The doors are interchangeable between 407s, handles are flush-mounted car-type.

The LongRanger’s extra left-hand cabin door is retained for loading a stretcher, with the aft-facing left-hand seat wider than its counterpart behind the pilot. The rear seat usually takes three passengers, but in the VIP configuration the centre space is taken by a folding armrest and there’s adequate room for four passengers in the main cabin. Lap and inertia reel shoulder harness is supplied for all passenger seats.

Bell used the four-blade main rotor and complete tail rotor drive train from the OH-58D Kiowa Warrior, and the transmis¬sion also comes from the OH-58D, with larger bearings and redesigned gears to increase fatigue life.
The four 255 mm chord composite blades (Nomex honeycomb core, glass fibre reinforced plastic spar and skin) have tapered tips and unlimited fatigue life, and are attached to a flexible GFRP yoke which accom-modates flapping motion, with elastomeric dampers and bearings for lead-lag and pitch-change motion. A Frahm damper on top of the hub takes care of rotor vibration, and the transmission is attached to the airframe by SAVITAD (system for attenuating vibration independent of tuning and damping) which comprises two beams with elastomeric mounts and retained by springs.

The “avoid curve” is at 800 ft or 70 kts, almost twice that of the JetRanger. The low-inertia rotor also leads to a restriction in climb rate to 2000 ft/min. Although the 407 is capable of much more, over 4000 ft/min.
Although the tail rotor system is taken from the OH-58D, the Kevlar/Nomex blades are longer and give enough authority to allow takeoffs in 35 kt winds from any direction. Tail rotor control is also hydraulic.
Normal MTOW is 2267 kg, increased to 2499 kg with an external jettisonable load, as the gross weight is dictated by the landing skids and structure. Maximum external load is 1200 kg, but for normal passenger use it can take full fuel and seven people with light baggage and still be under gross weight.

The Rolls-Royce Allison 250-C47B turboshaft is controlled by a full-authority digital engine control system, the first to be fitted to a single¬ turbine light helicopter.

The 407 can handle slopes 5 degrees nose down or 10 degrees nose up or to either side, due in part to a pivoted rear undercarriage cross member.

A proof of concept demonstrator featuring bulged cabin door, a four blade rotor system (off the 406) and Allison 250-C47 turboshaft. A Law Enforcement demostrator was demonstrated in 2002, with a Rolls-Royce/Allison 250-C47B engine.

The concept demonstrator 407 (N407LR) was first flown on 21 April 1994 (standard Bell 206L-3 modified with tailboom and dynamic system of military OH-58D, plus sidewall fairings to simulate broader fuselage), and the programme was first revealed at Heli-Expo ’95, Las Vegas, January 1995. Two prototype/ pre-production 407s (C-GFOS and C-FORS) were first flown on 29 June and 13 July 1995, respectively.

The first producrion airframe (C-FWQY/N407BT) was flown 10 November 1995 and Transport Canada certification was received on 9 February 1996 with FAA certification following on 23 February.
The first customer delivery was at Heli-Expo ’96, Dallas, in February 1996.
A MoU of June 1996 provided for licensed assembly and marketing by Dirgantara (formerly IPTN) of Indonesia.

After extensive flight testing in the wake of three accidents, Transport Canada and the FAA approved an increase in the Bell 407’s maximum speed to 130 kt. from 100 kt., and company officials expected to restore the light helicopter’s 140-kt. never exceed speed (Vne) by the third quarter of 1999.

The latest approval is predicated on compliance with a Bell Helicopter Textron Alert Service Bulletin (ASB) that calls for installation of a redesigned tail rotor hub and blades as well as addition of mechanical stops on the anti-torque pedals. A Bell official said the stops restrict left pedal travel to 20.75 deg. from 28 deg., but right pedal travel remains at 14 deg.

In addition, the hub design moves the tail rotor centerline outboard 0.86 in. and provides an additional 2.4 in. of clearance between the tail boom and the tail rotor blades at maximum flapping angle. The chief performance penalty is reduced tail rotor authority at high altitudes, a Bell official said. The company has begun incorporating the changes into production 407s at its facilities in Mirabel, Quebec.

Bell also plans to provide parts to complete the modifications at no expense to operators in the field. According to the official, there were more than 350 of the single-engine 407s in operation worldwide in 1999. The helicopter entered service in 1996.

Company engineers and test pilots developed ancl evaluated the latest fix during a series of special flight tests in March and April that exceeded normal Transport Canada certification requirements by a significant margin, the official said. The tests centered on flying a 407 at 130 kt. indicated airspeed and using each anti-torque pedal to its mechanical stop in less than 0.4 sec. Although the abrupt applications were applied repeatedly, the tail rotor blades did not contact the tail boom structure and several inches of clearance were maintained, he said.

The 130-kt. approval comes about two months after Bell began conducting a series of special flight tests to increase Vne above a 100-kt. limit imposed on the aircraft early in 1999. The restriction was imposed after the tail booms of three 407s were severed following left pedal inputs. The first accident occurred in 1997 in the U.S., the second in 1998 in South Africa, and the third occurred in Brazil.

According to a Bell official, investigation has revealed that each f the accidents was cause by a sudden, full input of the left tail rotor pedal at cruise airspeed.” The sudden input “caused exceptional flapping (deflection) of the tail rotor” blades that damaged pitch stops and the pitch control links. As a result, the blades struck the tail boom aft of the horizontal stabilizers, severing it. The cause of the pedal input, however, has not been fully explained but pilot error is not being ruled out.

To reinstate the 407’s original 140-kt. Vne, Bell was instrumenting a 407, at its Mirabel site, in preparation for beginning flight tests of a solenoid-operated airspeed sensing system that will automatically engage/disengage the pedal stops depending on airspeed. If the helicopter is flying below 50 kt. the stops will be retracted to permit 28 deg. of left pedal travel and maximum tail rotor authority. Above 55 kt., the solenoid will engage the stops and limit left pedal travel to 20.75 deg.

The system, which is redundant and features a mechanical override, will be standard equipment in the twin-engine Bell 427. That aircraft was completing certification by Transport Canada and FAA.

The 500th production Bell 407 was delivered in October 2001 to Pabst Air, Germany, and 550 had been delivered to operators in 45 countries by early 2003; fleet time then totalled more than 745,000 hours.
Total of 62 delivered in 1999, 62 in 2000, 47 in 2001 and 33 in 2002.
COSTS: US$1.37 million (1999) flyaway.
Development cost were estimated as US$50 million, of which US$9 million provided by Canadian government.

Bell 407
Engine: One Rolls-Royce 250-C47B turboshaft, 606kW for T-O, 523kW
Max continuous pwr: 630 shp
Transmission rating: 503kW for T-O, 470kW continuous op
Main rotor diameter: 10.7m
Rotor speed: 413 rpm
Length: 12.7m
Height: 3.7m
Take-off weight: 2267kg
Empty weight: 1178kg
Useful load: 1058 kg.
Standard usable fuel: 484 lt
Optional aux fuel: 72 lt
Max speed at sea level: 252km/h
Vne: 204km/h / 140 kts
Max cruise: 133 kt.
LR cruise: 121 kt
Hovering ceiling, OGE: 2470m / 12,200 ft
Hovering ceiling, IGE: 3440m / 10,450 ft
Service ceiling: 5460m
Max ROC: 2000 fpm
Range: 608km
Loiter @ 60 kt: 3.8 hr.
Internal payload: 1089kg
External payload: 1200kg
Crew: 1
Passengers: 6

Bell D-292 ACAP

In February 1981 the US Army’s Applied Technology Laboratory announced that Bell Helicopter and the Sikorsky Aircraft Division of United Technologies had both been awarded contracts for the design, construction, and initial flight testing of composite airframe research helicopters as part of the Advanced Composite Airframe Programme (ACAP). The programme is the development of an all-composite helicopter fuselage lighter and cheaper to build, per production airframe, than conventional machines. Bell and Sikorsky were each awarded contracts for the production of three machines; a tool-proof vehicle, a static test vehicle, and a flight test vehicle. Bell’s ACAP machine, which carries the company model number D292, made its first hover flight on 30 August, 1985. By mid-January 1986 the aircraft had completed twelve of its projected fifty flight test hours.

The D292 was based on Bell’s commercial Model 222 twin- turbine light helicopter and used that machine’s Avco Lycoming engines, transmission, and two-bladed main and tail rotors. The ACAP’s tailboom, vertical fin, and rotor pylon are almost identical in appearance to those of the 222, though the D292’s entire elongated pod-and-boom airframe is constructed of glass-reinforced plastic (GRP), graphite, and Kevlar. The use of a particular composite material for a specific aircraft component is determined by the strength, flexibility or other primary characteristic required of that component. The D292’s basic load-bearing structure is thus constructed primarily of graphite or graphite/epoxy, while the flooring and most of the craft’s exterior ‘skin’ is made of a more ballistically-tolerant Kevlar/ epoxy or glassfiber/epoxy blend. The seats for the helicopter’s two crew members and two passengers are of Kevlar/epoxy and are designed to absorb the high vertical loads of a forty-foot- per-second crash landing, as are the legs of the craft’s non-retracting tailwheel landing gear.
In addition to 15 hours of ground running and 50 hours of flight testing, which were completed in October 1985, the D-292 was used for shake testing and controls proof loading. A five-phase militarisation test and evaluation programme (MT&E) began in 1985 and was completed in 1988, following evaluation of undercarriage crashworthiness, lightning protection system, internal acoustics and additional repairability demonstrations. This programme included dropping the helicopter airframe from 12m in September 1987 at the NASA Langley Research Centre to demonstrate the capability of meeting stringent military crash survivability requirements. This included a 15m/s impact velocity at an aircraft attitude of ten degrees roll and ten degrees nose up pitch without any apparent serious injuries to the four dummy occupants (this impact velocity was comparable to a free fall from a three-storey building). Another major advancement demonstrated by the Bell ACAP design during these tests was the fuel system which totally contained the fuel during the drop test, thus reducing the risk of post-crash fires. But the main purpose of the ACAP programme was to achieve the US Army’s goal of reducing weight and cost, as well as improving military helicopter characteristics, by demonstrating the application of advanced composite materials. In this sphere, the Bell D-292 featured a weight reduction of 22% in the airframe structure, a 17% saving in cost, survivability in a vertical crash, and reduced radar signature. These comparisons were made possible because Bell and Sikorsky each also designed a duplicate aircraft of current conventional metal construction.

D292 ACAP
Engine: 2 x Avco Lycoming LTS 101-750C-1 turboshaft, 510kW
Main rotor diameter: 12.80m
Fuselage length: 12.32m
Height: 3.40m
Take-off weight: 3395kg
Empty weight: 2615kg
Crew: 2
Passengers: 2

Bell 400 / 440

In February 1983, Bell announced the both commercial and military, single and twin-engined, Model 400 TwinRanger. This seven-seat aircraft was in the 1800-2700kg gross weight class. The Model 400 was powered by two 443shp Allison 250-C20R turboshaft engines, had a four-blade soft-in-plane main rotor, an advanced technology transmission and drive system with ‘run-dry’ capability.
The aircraft entered development in 1983 with wind-tunnel testing with a one-quarter scale model and flight testing of the dynamic components on a specially modified Model 206LM LongRanger (c/n 45003, N206N) which served as test-bed and flew in March 1983. This aircraft had the four-bladed OH-58D AHIP rotor, a strengthened tail boom, a ring guard tail rotor and a deepened fuselage to increase fuel capacity.
The first prototype Model 400 (c/n 48001, N3185K) flew on 30 June, 1984, powered by Allison engines.
Three pre-production Model 400 TwinRangers (c/n 48002/ 48004) were built, the first of which (N3185L) flew for the first time on 4 July, 1985, the second (N3185U) in May and the third (N400BH) in June 1985. The first aircraft was later used as a ground test vehicle.
It was expected that the Canadian factory, at Mirabel, Montreal, would undertake production of the Model 400 and develop the Model 400A, a variant of the Model 400 powered by a single 1000shp Pratt & Whitney Canada PW209T turboshaft engine, and employing major composites components.
The programme was suspended indefinitely pending a market situation that would support an annual sales rate of about 120 aircraft. The four existing aircraft have been cancelled from the register and put in storage by Bell Helicopter Textron Canada, at Mirabel.

Model 400
Rotor diameter: 11.30m
Overall length: 13.39m
Length of fuselage: 11.02m
Height overall: 3.56m
Maximum take-off weight: 2495kg
Empty weight: 1427kg
Maximum speed: 278km/h
Maximum cruising speed at 1525m: 244km/h
Initial rate of climb: 464m/min
Service ceiling: 6100m
Hover ceiling outside ground effect: 3110m
Hover ceiling in ground effect: 4360m
Maximum range: 834km

Bell 309 KingCobra

Bell announced the development of a new combat helicopter on 28 September 1971, derived from the Model 209 and 211, with company funds, with a 1.10m longer fuselage supporting a larger diameter rotor measuring 14.63m. Both the main and tail rotors had wider chord blades and the main rotor blades had double swept tips to reduce noise levels and improve performance at high speed. The nose was also modified to accept new apparatus, the available space for ammunition was increased, and the wing span was taken to 3.96m. A redesigned tail assembly was used with a lower fin for improved longitudinal stability. It also had the transmission, wide-chord two-blade main rotor and drive train of the Model 211 HueyTug. Design work was begun by a team led by Joe Tilley and construction started in January 1971.
Two prototypes of the Model 309 Kingcobra were built.
The first (c/n 2503, registered N309J), which flew on 10 September 1971 at Fort Worth with Gene Colvin at the controls, was offered to the Marines with Turbo Twin Pack T400-CP-400 engines, while the second prototype (which flew in January 1972) was offered to the Army with a 2890shp Lycoming T55-L7C turbine of the Model 211, derated to 2050 on take-off.
The KingCobra incorporated new avionics and systems to fulfill its anti-tank mission (inertial navigation system, APN-198 radar altimeter, fire-control computer, multi-sensor sight, head-up display, helmet sighting system, FL-33 FLIR, low-light level television and, of course TOW guidance system). Armament included provision for sixteen TOW missiles under extended stub wings and a General Electric chin-turret housing a three-barelled 20mm Gatling gun with 1345 rounds.
On 11 April 1972, the first prototype was damaged in an accident. To meet future Army needs it was decided to convert the twin-engined 309 into single-engined configuration. As expected, on 9 August, 1972, the Army finally cancelled the Cheyenne programme and in due course two helicopter manufacturers, Sikorsky and Bell, submitted proposals for a less sophisticated aircraft, the Model S-67 and the Model 309 respectively. Tests and demonstrations were successfully conducted with both aircraft, but the Army set up new requirements and opened a new contest within the Advanced Attack Helicopter programme (AAH) which would eventually lead to the selection of the MDD/Hughes AH-64 Apache.
The Bell Model 309 (N309J) is now preserved by the US Army Aviation Museum in Fort Rucker, Alabama.

Bell 309 Kingcobra
Engine: 1 x Lycoming T55-L7C turboshaft, 2155kW
Main rotor diameter: 14.63m
Length: 14.63m
Height: 4.11m
Take-off weight: 4510kg
Empty weight: 2890kg
Gross weight: 6350kg
Max speed: 330km/h

Bell 230 / 430

Bell 230

At the 1989 NBAA Convention, Bell announced its intention to develop an improved variant of its Bell 222. Powered by two 700shp Allison 250-C30-G2 turbines driving an advanced design two-blade rotor, the Model 230 could carry up to ten people in a 3.8cu.m passenger compartment. Internal fuel capacity had been increased to 930 litres with a maximum of 1359 litres with optional fuel tanks. A fixed skid undercarriage is also available and, from the 51st production aircraft, Bell will offer a variant powered by Lycoming LTS101-750 turbo-shafts. This helicopter is to be built at the company’s facility in Canada.

Bell 230 / 430 Article

Two prototypes were converted from Bell 222s at the Mirabel factory near Montreal and the first of these (registered C-GEXP) accomplished its maiden flight on 12 August, 1991. The type received Transport Canada type approval on 12 March 1992 and the production aircraft (C-GAHJ) first flew on 23 May 1992. Deliveries began on 16 November 1992. A total of 37 were delivered by January 1998. The second prototype (C-GBLL) flew on 3 October 1991. An initial order for twenty was placed by Bell’s Japanese representative Mitsui & Co, in Tokyo, with first deliveries due in August 1992.

A Military demonstrator (N230CN) was leased for six months by Chilean Navy 1993-94, equipped for shipboard evaluation with Indal ASIST deck recovery system, auxiliary fuel tanks, Breeze Eastern BL 1600 rescue hoist, AlliedSignal RDR 1500B radar, Teledyne AN/APX-101 transponder, AlliedSignal KHF-950 SSB transceiver, Magnavox AN/ARC-164 UHF, Rockwell AN/ARC-186 VHF, Spectrolab SX-5 Starburst searchlight, Agema thermal imager in Heli-Dyne turret, Honeywell EDZ-705 EFIS with SPZ-7000 AFCS, Trimble TNL 7880 GPS/Omega and Flight Visions FV2000 HUD.

The first 50 aircraft were powered by two Allison 250-C30G2 turboshafts, each rated at 522kW for 5 minutes for T-O, 464kW maximum continuous, 581kW OEI for 2.5 minutes and 553kW OEI for 30 minutes. Main transmission rated at 690kW for T-O, 652.5kW maximum continuous and 548kW for single-engined operation. Usable fuel capacity 935 litres in skid gear version, 710 litres in wheeled version. Optional 182 litres of auxiliary fuel for both versions.
Equipped with a two-blade main rotor with stainless steel spars and leading-edges, Nomex honeycomb trailing-edge with glass fibre skin, and glass fibre safety straps; tail rotor blades stainless steel. Aluminium alloy fuselage with integral tailboom and some honeycomb panels. The landing gear is a tubular skid type on Utility version. Executive version to have hydraulically retractable tricycle gear, single mainwheels retracting forward into sponsons; forward-retracting nosewheel fully castoring and self-centring; hydraulic disc brakes on main units.
Controls are fully powered hydraulic, with elastomeric pitch change and flapping bearings; fixed tailplane with leading-edge slats and endplate fins; strakes under sponsons; single-pilot IFR system without autostabilisation.
Standard layout has forward-facing seats for nine persons (2-2-2-3) including pilot(s). Options include eight-seat executive (rear six in club layout), six-seat executive (rear four in club layout with console between each pair), or 10-seat utility (2-2-3-3, all forward-facing). Customised Emergency Medical Service (EMS) versions also available, configured for pilot-only operation plus one or two pivotable stretchers and four or three medical attendants/sitting casualties respectively. Two forward-opening doors each side. Entire interior ram air ventilated and soundproofed. Dual controls optional.
The main and tail rotors substantially same as Bell 222, former having Wortmann 090 blade section with 8 per cent thickness/chord ratio and swept tips. Independent (hydraulic) rotor brake. Short span sponson each side of fuselage houses mainwheel units and fuel tanks, and serves as work platform.

Bell 430
Preliminary design began in 1991 for a four-blade rotor, higher-powered and stretched variant of Bell 230, The programme was launched in February 1992 and two prototypes were modified from Bell 230 airframes: first prototype (C-GBLL; wheel-equipped) flown 25 October 1994; second prototype (C-GEXP; skid-equipped, with complete avionics suite) flown 19 December 1994. The first flight of a production 430 (C-GRND) was in 1995 and deliveries began on 25 June 1996 after Canadian type approval on 23 February.
The second production aircraft, N4300 circumnavigated the world in a record time of 17 days 6 hours 14 minutes, landing back at Fairoaks, UK, on 3 September 1996.
Neiman Marcus Special Edition was introduced in 2001 for Neiman Marcus store’s 75th Christmas catalogue, featuring three-colour custom metallic exterior paint scheme with NM signature. Italian leather and rosewood interior, sculpted carpets with NM logo, passenger refreshment centre, Blaupunkt AM/FM/CD entertainment centre. JetMap cabin information system with moving map displays on two ceiling-mounied monitors. Motorola cellphone and two computer ports.
The first delivery, on 25 June 1996, was the sixth production aircraft (N6282X) handed over to IPTN (now Dirgantara) of Indonesia in eight-seat executive configuration. Thirteen were delivered in 1996; followed by eight, 15 and 18 in 1997-99, 11 in 2000, 14 in 2001 and seven in 2002.

430

Optimised for high cruising speed with (retractable) wheel landing gear, although traditional skids optional; inclined towards executive transport market. Bell 230 fuselage lengthened by 0.46m plug; Bell 680 all-composites four-blade bearingless, hingeless main rotor; approximately 10% power increase over Bell 230; uprated transmission; and optional EFIS. Short-span sponson each side of fuselage houses mainwheel units and fuel tanks, and serves as work platform.
Fully powered hydraulic, with elastomeric pitch change and flapping bearings; fixed tailplane with leading-edge slats and endplate fins; strakes under sponsons; single-pilot IFR system without auto-stabilisation.
Semi-monocoque fuselage of light alloy, with limited use of light alloy honeycomb panels. Fail-safe structure in critical areas. One-piece nosecone tilts forward and down for access to avionics and equipment bay. Short span cantilever sponson set low on each side of fuselage, serving as main landing gear housings, fuel tanks and work platforms. Section NACA 0035. Dihedral 3deg 12min. Incidence 5deg. Sweepback at quarter-chord 3deg 30min.
Fixed vertical fin in sweptback upper and lower sections. Tailplane, with slotted leading-edge and endplate fins, mounted midway along rear fuselage. Small skid below ventral fin for protection in tail-down landing. Four-blade main rotor with stainless steel spars and leading-edges. Nomex honeycomb trailing-edge with glass fibre skin, and glass fibre safety straps; tail rotor blades stainless steel. Rotors shaft-driven through gearbox with rwo spiral bevel reductions and one planetary reduction. Main blade and hub life, 10.000 hours.
Tubular skid type on Utility version. Executive version has hydraulically retractable tricycle gear, single mainwheels retracting forward into sponsons; forward-retracting nosewheel fully castoring and self-centring; hydraulic disc brakes on main units. Mainwheel tyre size 18×5.5, nosewheel 5.00-5. Emergency floats optional.
Two Rolls-Royce 250-C40B turboshafts, each rated at 603kW for T-O and 518kW maximum continuous. OEI ratings 701kW for 30 seconds, 656kW for 2 minutes, 623kW for 30 minutes and 602kW continuous. Chandler Evans FADEC. Transmission rating 779kW for 5 minutes for T-O, 737kW maximum continuous. Power train TBO, 5,000 hours. Usable fuel capacity 935 litres in skid version, 710 litres in wheeled version; provision in both versions for 182 litre auxiliary tank. Fuel system is rupture resistant, with self-sealing breakaway fittings.
Standard layout has forward-facing seats for nine persons (two-two-two-three) including pilot. Options include 10-seat layout (two-two-three-three); eight-scat executive (rear six in club layout), six-seat executive (rear four in club layout with console between each pair); and five- and four-seat executive with one or two refreshment cabinets; seat pitches vary between 86cm and 91cm. Pilots on crashworthy (energy attenuating) seats, which are optional for passengers. Customised emergency medical service (EMS) versions also available, configured for pilot-only operation plus one or two pivotable stretchers and four or three medical attendants/sitting casualties respectively. Two forward-opening doors each side; EMS version has optional stretcher door between forward and rear doors on port side. Entire interior ram air ventilated and soundproofed. Dual controls optional.
Standard equipment includes rotor and cargo tiedowns, ground handling wheels for skid version, retractable 450W search/landing light. Options include dual controls, auxiliary fuel tankage, force/feel trim system, more comprehensive nav/com avionics, 272kg capacity rescue hoist, 1587kg capacity cargo hook, emergency flotation gear, heated windscreen, particle separator and snow baffles.
The programme cost US$18 million, 35% financed by Canadian Defence Industry Productivity Program (DIPP) and repayable as royalty on each sale.

Bell 230
Engine: 2 x Allison 250-C30G/2, 720 shp each, dual max: 690 kW.
Instant pwr: 520 kW.
Rotor dia: 13.8 m.
Empty wt: 2270 kg.
MTOW: 3813 kg.
Payload: 1472 kg.
Useful load: 1270 kg.
Max speed: 140 kts.
Vne: 150 kts.
Max cruise: 135 kts.
Max range: 705 km.
HIGE (@MAUW): 12,400 ft.
HOGE (@MAUW): 7300 ft.
Service ceiling: 14,100 ft.
Opt fuel cap: 1359 lt
Crew: 1/2.
Seats: 8/10.
Rescue hoist capacity: 136kg
Cargo hook capacity: 1,270kg

Bell 430
Engine: Allison 250-C40.
Instant pwr: 582 kW.
Rotor dia: 13.8 m.
MTOW: 5443 kg.
Max cruise: 135 kts.
Vne: 150 kts.
Max range: 705 km.
Seats: 8/10.

230
430

Bell 222

In March 1974 Bell decided to commit its own resources to the development of a new twin-turbine, ten-seat helicopter. This helicopter was evolved from studies begun in the late 1960s which had led, in 1973, to the Design D-306, a twin-turboshaft helicopter. The engines were to be either the 500shp Allison 250-C28, the 590shp Lycoming LTS-101 or the 650shp Pratt & Whitney Canada PT7B driving the Bell classic two-blade main rotor. The D-306 could accommodate two pilots and eight passengers (four passengers in executive configuration).
In January 1974, a full-scale mock-up of the D-306 was displayed at the Helicopter Association of America (HAA) convention in order to study the market potential and to gather the would-be customers remarks in order to upgrade the project.
The reactions were so promising that, on 20 April, 1974, Bell announced its decision to go ahead with the Model 222, five prototypes of which were to be built and which were quite similar to the D-306 (the windscreen was improved and the fuselage lengthened by a few inches). The Model 222 was the first completely new Bell design to reach production status since the JetRanger and the Model 222 was described then as ‘the first American made light twin-turbine helicopter’. It had a semi-monocoque light alloy fuselage with a hydraulically retractable tricycle undercarriage. The two Avco Lycoming turboshafts drove a two-blade main rotor through a gearbox with two spiral bevel reductions and one planetary reduction.
The maiden flight of the prototype was expected by the end of 1975 but, in fact, the first prototype (c/n 47001, N9988K) got into the air on Friday 13 August, 1976, with Donald Bloom at the controls. Certification by the FAA under FAR Part 29 was received on 16 August, 1979, followed by approval for VFR operation on 20 December of the same year. On 15 May, 1980, the Model 222 received FAA approval for single-pilot IFR operation.
The Bell 222 has a light alloy structure, and a fuselage built around a large cabin which can seat two pilots and five or six passengers in the executive trim. In all configurations, there is a bench seat at the back for three, which fits into the L-shape of the fuel tank behind it. The executive Bell 222 is sold with full IFR capability. One alternative is the offshore configuration for ferrying eight passengers to offshore oil platforms.
The large main rotor with two wide blades is of steel with a honeycomb core. The blades are held to the rotor hub by standard Bell elastomeric bearings. The tail rotor is also metal with two blades. The twin Lycoming LTS-101-650 engines are mounted side-by-side above the fuselage and have integral particle separators. The fuel is contained in three tanks, one in the fuselage and two in the sponsons into which the main landing gear members retract.
During flight tests several improvements were introduced on the prototypes, the most obvious being a completely new tail configuration. With the fourth prototype (c/n 47004, N680L) a new tail layout was adopted: the T tail was replaced by tailplanes and end-plate fins fixed forward of the rear fuselage. The main rotor diameter has been increased by 12 in (30,5 cm) and a slightly more powerful version of the Lycoming turboshaft engine has been adopted, to off-set some weight growth attributable to the new tailplane and larger rotor.
The fifth prototype (c/n 47005, N2228X), representative of the production aircraft, was presented at the Paris Air Show in June 1978. In fourteen months, the five prototypes logged more than 600 flying hours and by December, 1977, the figure of 700 hours was reached. The first for Petroleum Helicopters were delivered in January 1980.

Bell 222 ZK-HFQ

Production was launched with a backlog of orders for some 140 aircraft and Bell had to boost its planned production from 125 machines the first year to 137. On 16 January 1980, Petroleum Helicopters Inc (New Orleans) received the first of its sixteen machines soon followed by Schiavone Construction which received an aircraft in executive configuration. Heliflight Systems (Houston), Aerogulf Sales Co (Dubai), Bemor Agencies (Bermudas), CSE Aviation Ltd (UK) and Astra Helicopters (South Africa) were among the main customers. On 18 January 1981, Bell Helicopters delivered its 25,000th helicopter, a Model 222, to Omniflight Helicopters.
The Model 222 and 222A, first production variants were powered by two 592shp Avco-Lycoming LTS 101-650C-3 engines, their dry weight of only 110kg each providing a maximum power/ weight ratio of 4.58kW/kg at maximum rating.
The Model 222B was the second main production variant with accommodation for seven to nine passengers. The Model 222B incorporates numerous improvements such as a taller main rotor mast, increased diameter narrow-chord blades, larger tail rotor and lengthened tail boom. The powerplant consists of two 684shp Textron Lycoming LTS 101-750C-1 turboshafts. The fuel is contained in five crash resistant tanks located in the fuselage as well as in the sponsons, with a total capacity of 710 litres.
The Model 222B Executive is the luxury variant for five or six people with complete systems and avionics such as IFR, Sperry coupled automatic flight control system and VOR/LOC. Luxury equipment includes automatic temperature control, fluorescent and reading lights and window curtains. A stereo system and refreshment cabinet are optional.
In 1982, the Model 222B became the first transport category helicopter to be certificated by the FAA for single-pilot IFR flight without stability augmentation. Model 222U and 222UT: the Model 222UT (UT for Utility Twin) variant is externally recognisible by its tubular skid undercarriage in place of the usual retractable wheels. It can accommodate up to eight passengers and could have a fuselage mounted flotation system. The powerplant is the same as for the Model 222B but fuel capacity has been increased to 930 litres. This variant received VFR and single-pilot IFR certification during the spring of 1983.
The basic Model 222B feature include:
ROTOR SYSTEM: Two-blade main rotor. Blade section Wortmann 090. Thickness chord ratio 8 per cent. Each blade has a stainless steel spar with bonded glass fibre safety straps to retard crack propagation and offer secondary load path; replaceable stainless steel leading-edge; and afterbody of Nomex honeycomb covered with glass fibre skin. Each blade is attached to the rotor head by two chordwise bolts. Small trim tab on each blade. Completely dry titanium main rotor hub has conical elastomeric bearings. Two-blade tail rotor of stainless steel construction, with preconing, underslung feathering axis and skewed flapping axis. Rotor blades do not fold. A rotor brake is standard.
ROTOR DRIVE: Rotors shaft driven through gearbox with two spiral bevel reductions and one planetary reduction. Transmission rating (two engines) 690kW. Single-engine rating 548kW. Main rotor engine rpm ratio 1:27.4; tail rotor engine rpm ratio 1:5.08.
SPONSONS: Short-span cantilever sponson set low on each side of fuselage, serving as main landing gear housings, fuel tanks and work platforms. Section NACA 0035. Dihedral 3deg 12min. Incidence 5deg. Sweepback at quarter-chord 3deg 30min. All-metal structure of light-alloy sheet and honeycomb. No movable surfaces.
FUSELAGE: Semi-monocoque structure of light alloy, with limited use of light-alloy honeycomb panels. Fail-safe structure in critical areas. One-piece nosecone tilts forward and down for access to avionics and equipment bay.
TAIL UNIT: Cantilever structure of light alloy. Fixed vertical fin in sweptback upper and lower sections. Tailplane, with slotted leading-edge and endplate fins, mounted midway along rear fuselage. Small skid below ventral fin for protection in tail-down landing.
LANDING GEAR: Hydraulically retractable tricycle type. All units retract forward, mainwheels into sponsons. Free-fall extension in emergency. Oleo-pneumatic shock-absorbers, with scissored yoke. Self-centring nosewheel, swivelling through 360degrees. Single wheel and tyre on each unit. Mainwheel tyres size 6.00-6, pressure 5.18 bars. Nosewheel tyre size 5.00-5, pressure 4.14 bars. Hydraulic disc brakes. New-type water-activated emergency pop-out floats optional. Model 222UT has skid-type landing gear and lock-on ground handling wheels, with fuselage-mounted flotation system optional.
POWER PLANT: Two Textron Lycoming LTS 101-750C-1 turboshafts, each rated at 510kW for take-off, mounted in a streamline housing above the cabin and aft of the rotor pylon. Bell focused pylon with nodalisation. Fuel contained in five crash-resistant internal bladders, in fuselage and sponsons, with total capacity of 710 litres in Model 222B. Model 222UT has maximum fuel capacity of 931 litres. Rear seat fuel tank, capacity 246 litres, and parcel shelf fuel tank, capacity 181 litres, optional on both models. Single-point refuelling on starboard side of fuselage. Oil capacity 6.5 litres per engine.
ACCOMMODATION: Pilot and seven passengers in standard 2-3-3 layout, alternatively pilot, co-pilot and six passengers. Two additional passengers can be accommodated in a high-density 2-2-3-3 arrangement. Energy attenuating seats, all with shoulder harness in Model 222B. Crew door at forward end of cabin on each side; cabin door on each side immediately forward of wing. Space for 1.05cu.m of baggage aft of cabin, with external door on starboard side. Ventilation standard; air conditioning and heating optional.
First deliveries of the Model 222UT were in September 1983. Among the main operators are the New York City Police Department, the Port Authority of New York, Michigan State Police, West Virginia State Police and Lloyd Helicopters.
From 1982, the fourth prototype (N680L) served as test bed for the Model 680 four-blade composite bearingless rotor system, designed to improve performance and reduce noise. On 10 November, 1987, this Model 222 flew with a digital control system developed by Bell and Lucas Aerospace which gave the engine the ability to adapt its characteristics in flight.
To 1992, one hundred and fifty-six Model 222Bs and seventy-two 222UTs have been delivered, mainly on the civil market. Only two aircraft are known to have been taken on charge by military customers: one by the Uruguayan Air Force and the other by the Uruguayan Navy.
Production ceased in 1989.

Versions:

222A
Initial production model powered by twin 462kW Lycoming LTS 101 650C-3 turboshaft engines. Replaced from late 1982 by the Model 222B. Total 82 built.

222B
Standard production model from late 1982. More powerful, 510kW Lycoming LTS 101 750C-1 engines; fuselage increased by 0.43m and main rotor diameter 0.69m larger. Strakes added to sponsons. First flight 1 August 1981; FAA certification 30 June 1982. On 29 July 1982, the 222B became the first transport category helicopter to be certified by the FAA for single-pilot IFR flight without stability augmentation. Total of 26 produced between 1982 and 1987.

222B Executive
Fully equipped for both single- and dual-pilot IFR flight. Honeywell coupled automatic flight control system to provide stability augmentation and automatic hold for attitude, altitude, heading and airspeed, plus VOR/LOC course and glide slope hold during approach. Collins Pro Line avionics include dual VHF com, dual VOR nav with glide slope. ADF, marker beacon receiver, transponder, DME and area navigation. Luxury accommodation for five or six passengers, with automatic temperature control, fluorescent and reading lights, window curtains and ceiling speakers. Optional stereo system and refreshment cabinet.

222UT (Utility Twin)
Utility version, incorporating the improvements and power plant detailed for the Model 222B. Retractable tricycle landing gear replaced by tubular skid gear with lock-on ground handling wheels. Fuselage-mounted flotation system optional. Standard seating for a pilot and six or seven passengers. Optional layout for a pilot and eight passengers. First flight 7 September 1982. VFR and single-pilot IFR certification received in Spring 1983; customer deliveries began in September 1983. Total of 80 built up to 1989.

Specifications:

Bell 222
Power Plant: Two Lycoming LTS 101-650C2 turboshafts each with a contingency rating of 675 shp, take-off rating of 615 shp and continuous rating of 590 shp.
TBO: 2400 hr
Max continuous speed, 173 mph (278 km/h) at sea level
Normal cruise @ 3000 ft: 135 kts.
Long-range cruising speed, 150 mph (241 km/h) at sea level
Hovering ceiling (OGE), 8,200 ft (2500 m) in ISA and 4,000 ft (1 220 m) in ISA plus 20 deg C
Hovering ceiling (IGE), 13,000 ft (3962 m) in ISA and 10,000 ft (3050 m) in ISA plus 20 deg C
Single-engine ceiling, 9,000 ft (2743 m) in ISA and 5,100 ft (1555 m) in ISA plus 20 deg C
Range with 20-mm reserve, 400 mls (644 km) at 8,000 ft (2440 m)
Max rate of climb: 1580 fpm.
Service ceiling: 12,800 ft.
FAA empty weight, 4,250 lb (1930 kg)
Standard empty weight: 4860 lb
Useful load, 2,950 lb (1 340 kg)
Take-off gross weight, 7,200 lb (3270 kg)
Fuel flow @ normal cruise: 482 pph.
Endurance @ normal cruise: 2.5 hr.
Max ramp weight: 7850 lb
Max useful load: 2990 lbs.
Max landing weight: 7850 lbs.
Max sling load: 2100 lbs.
Disc loading: 6.3 lbs/sq.ft.
Power loading: 6.4 lbs/hp.
Max usable fuel: 1287 lbs.
Main rotor diameter, 40 ft 0 in (12,19 m)
Overall length, 47 ft 9 in (14,55 m)
Overall height, 11 ft l .5 in (3,39 m)
Fuselage length: 10.98m
Undercarriage ¬track, 9ft (2,74 m)
Wheelbase, 11 ft 9 12 in (3,59 in)
Span over sponsons, 14 ft (4,27 m).
Accommodation: Up to 10 including pilot.
Baggage capacity, 43 cu ft (1,22 cu.m) in aft cabin and fuselage baggage compartment.

Bell 214

At the beginning of the 1970s a more powerful variant of the Model 205 (UH-1H) had been studied in which a 1,900shp Lycoming T53-L-702 turboshaft had replaced the standard 1,400shp T-53-L13 unit. The version, designated Model 214 HueyPlus, also retained the main rotor and tail rotor drive systems and the larger two-blade rotor of the Model 309 KingCobra (composite elasto¬meric), these offering better high speed and weight performance as well as reduced noise. The airframe was also strengthened including the pylon structure and fuselage.
The Model 214 prototype flew for the first time at Arlington in October 1970 powered by a 2185kW Avco Lycoming LTC4B-8D turboshaft engine. Development of the HueyPlus progressed steadily until 1972 when Iranian Army Aviation approached Bell for the design of a UH-1 derivative which could be operated in hot and high conditions. Several hundreds of this new type of helicopter would be delivered together with some two hundred AH-1J Cobras. A $500 million contract for 293 machines was signed on 22 December, 1972, by the US Army, acting on Iran’s behalf.
During the first phase of this programme, Bell built three additional prototypes of the Model 214. These were powered by 2,050shp Avco Lycoming T55-L-7C turbo-shafts, and in August 1972, one of them was shipped to Iran for evaluation. The tests were considered successful and Bell moved on to the Model 214A which was the production model. On this variant, power was increased further by the installation of a 2,930shp Avco Lycoming LTC4B-8D turboshaft which permitted operation at a greater gross weight. Three prototypes of the Model 214A were prepared by Bell (c/n 27001/27003), the first (N214J) making its maiden flight on 13 March, 1974. The second prototype flew in April 1974 and the third in May. Flight testing and certification were resumed in the following year.
The first production 16-seat Model 214A (c/n 27004) was taken in charge by the Iran Imperial Army Aviation (IIAA) on 26 April, 1975, which gave them the name Isfahan. Three days later, on 29 April, this aircraft with Maj-Gen Manouchehr Khosrowdad, commander of the IIAA, and Clem A Bailey, Bell’s assistant chief production test pilot, at the controls, established five new world records in the FAI Class E-1e. The helicopter reached a maximum altitude of 9070m and sustained a horizontal altitude of 9010m for 30 seconds. It also climbed to 3000m in 1min 58sec; to 6000m in 5min 13.2sec and to 9000m in 15min 05sec.
Subsequently, 39 generally similar aircraft, but with specific equipment for SAR operations, were delivered to the Iranian Air Force under the designation Bell Model 214C. The second batch was ordered in February 1976, and delivered between January 1977 and March 1978. A third batch of six Model 214As was ordered in March 1977 and this order was completed by the autumn of 1978.
The last Model 214A of the first batch was completed on 19 December, 1975.
Known as Model 214B BigLifter, this helicopter received FAA type certification on 27 January, 1976, but saw limited success and no more than seventy were produced. The Model 214B was externally similar to the Model 214A with the exception of an additional window in the side sliding door. Other differences included a fire-fighting system and new avionics. The Model 214B-1 variant was certificated under a different weight specification.
In its Isfahan plant, Iran intended to produce a larger and more powerful variant of the Model 214A capable of carrying up to 16 people and incorporating a stretched and widened fuselage. A Model 214A was modified by Bell with the installation of two 2,250shp General Electric T700/T1C turbo-shafts and tested in Iran in February 1977. The definitive Model, known as Model 214ST (ST stood for ‘Stretched Twin’, but this was later modified to ‘Super Transport’), had its fuselage stretched by 2.44m. Bell assembled three prototypes (two for commercial certification and one of the military variant, c/n 18401/ 18403).
Bell initiated the production of a first batch of 100 Model 214ST in November 1979. The first prototype (c/n 18401, N214BH) flew on 21 July, 1979. The production examples were powered by 2,930shp Avco Lycoming LTC4B-8Ds driving a large five-blade rotor with Noda-Matic head. In 1982, the Model 214ST received FAA and CAA type certification for VFR and IFR operations. The 214ST is fully IFR certified and has a computer-controlled fly-by-wire automatic elevator trim system, plus a stability and augmentation control system and main rotor blade in-flight tracking system. A version with wheel undercarriage was certificated in March 1983.
Designed for long-range offshore oil operations with cruise speeds of 140 knots, the 214ST operates to 650 kilometres range with 45 minutes reserve. Bell’s Super Transport can lift over three tons even on hot days at high altitudes. The Super Transport General Electric CT7-2A engine modules are designed for mechanical simplicity, requiring only 12 basic tools for line maintenance and module replacement. Options such as life rafts, pop-out floats, internal hoist or two 310 litre auxiliary tanks can be added.

Bell 214ST

Two versions were available, and the standard Model 214B was intended for a variety of purposes. They included operation as a 14-passenger transport with a crew of two; as a cargo lifter, with an external cargo hook certificated to carry a maximum load of 3629kg; in an agricultural role, carrying a very similar chemical load; or as a firefighter able to drop a total 2725 litres of fire retardant, carried in cabin and under-fuselage tanks. The alternative Model 214B-1 was certificated to different standards that allowed for operation at a lower gross weight with an internal load. The Model 214B was available to commercial operators from the receipt of certification on 27 January 1976 until production ceased in 1981.

The 214B BigLifter is derived essentially from the 204 and 205, and was specifically designed to better the lift capacity of any contemporary civil helicopter of the same power. The key to the type’s considerable lifting ability is the use of a 2930shp Lycoming T5508D turboshaft (the civil version of the T55-LTC4B-8D turboshaft powering the 214A and its search-and-rescue derivative, the 214C), flat-rated to 2250shp maximum output. The rotor and transmission are identical with those of the 214A, the transmission being capable of accepting up to 2050shp at take-off and 1850shp for continuous running.
The rotor system is of an advanced type, the blades having swept tips and the hub featuring elastomeric bearings on the flapping axis. The twin-blade tail rotor has a hub which needs no lubrication. Other advanced features of the type are the use of an automatic flight-control system, with the capability of altitude maintenance and augmented stability; dual hydraulic systems; a nodalized suspension (Bell’s patented ‘Noda- Matic’ concept of 1972, by which the fuselage is suspended from points of no relative motion in the engine mounting) to reduce fuselage vibration by about 80%; and an engine decking that is also used as a maintenance platform for the engine, transmission and rotor hub.
The 214B BigLifter carries to an extreme the Bell design philosophy of a twin-blade wide-chord main rotor, each of the blades having a chord of no less than 88.9cm. The transmission and rotor-drive systems are well proved by earlier use in the 214A, after development in the experimental KingCobra gunship helicopter.
Although it is intended mainly as a weight-lifter, the 214B can carry up to 14 passengers in addition to its crew of two. As a weight-lifter, however, the 214B can carry up to 1814kg internally, or up to 3175kg externally on its cargo hook, which is cleared for flight with loads weighing up to 3629kg. This weight-lifting capacity is also useful in the agricultural role, in which up to 3629kg of chemicals or 3023 litres of liquid can be uplifted. The considerable liquid-carrying capability of the 214B is also useful for fire-fighting.
The Model 214B-1 is intended for different certification standards, and is thus limited in the internal load-carrying role to a maximum take-off weight of 5670kg.
Production began in 1981, deliveries started in 1982 and by the beginning of 1984, some twenty machines were in service and seventy-eight had been delivered by early 1988. Among the first operators were British Caledonian Helicopters (c/n 28109/28110; G-BKFN and G-BKFP) which operated offshore in the North Sea and People’s Republic of China. By 1992 some two hundred Model 214STs have been sold. The bulk of the Model 214ST production has found its way on to the civil market and only a few have been delivered to military customers: Brunei (one), Peru (eleven), Thailand (nine) and Venezuela (four) and Sultan of Oman’s Air Force which operated eight Model 214B/STs from Salalah during the war against Iraq in January/February 1991.
The Bell 214ST features:
ROTOR SYSTEM: Two-blade advanced technology main rotor. Each blade has a unidirectionally laid glass fibre spar, with a 45degree wound torque casing of glass fibre cloth. The trailing-edge is also of unidirectional glass fibre, and the space between spar and trailing-edge is filled by a Nomex honeycomb core. The entire blade is then bonded together by glass fibre wrapping, with the leading-edge protected by a titanium abrasion strip and the tip by a replaceable stainless steel cap. Two-blade tail rotor; interchangeable blades, each with a stainless steel leading-edge spar and covering, aluminium honeycomb core and glass fibre trailing-edge strip. Main rotor head incorporates elastomeric bearings. Second-generation Noda-Matic nodal suspension system. Nodal beam requires no lubrication. Main rotor brake standard.
ROTOR DRIVE: Main transmission has a maximum rating of 1,752kW, maximum continuous rating of 1,454kW, and single-engine rating of 1,286kW. Combining, intermediate and tail rotor gearboxes, each with 1 hour run-dry capability.
FUSELAGE: Conventional all-metal semi-monocoque structure, incorporating rollover protection ring.
TAIL SURFACE: Electronically controlled elevator, which minimises trim changes with alterations of power and CG, and improves longitudinal stability.
LANDING GEAR: Choice of energy absorbing non-retractable tubular skid-type or tricycle-type wheeled landing gear.
POWER PLANT: Two 1,212kW General Electric CT7-2A turboshafts, connected to a combining gearbox. In the event of an engine failure, the remaining engine is capable of developing 1,286kW to provide continued flight capability. Standard fuel capacity 1,647 litres, contained in seven interconnected rupture-resistant cells, arranged to provide two independent fuel systems as required by FAR Pt 29. Single-point refuelling. Auxiliary fuel system optional, consisting of two tanks in rear of cabin, each of 329 litres capacity; 95 litre underseat auxiliary fuel tanks also available. Engine anti-icing and inlet screens standard.
ACCOMMODATION: Standard seating for pilot, co-pilot and up to 18 passengers. Dual controls standard. Crew seats adjustable. Passenger seats in three rows across cabin plus a two-place bench seat on each side of rotor mast. Standard configuration offers utility or de luxe interiors with contemporary or energy attenuating seats. Jettisonable crew door each side. Large cabin door on each side for passengers or easy loading of cargo. Glass windscreens, with standard anti-icing system. Two emergency exits on each side. Baggage space aft of cabin, capacity 1.84cu.m. Passenger seating removable to provide 9.23cu.m of cargo capacity. Cabin heated and ventilated.

It was reported in July 1982 that Bell had obtained FAA certification for an increase from 16 to 18 passengers that can be carried in the 214ST Super Transports (plus two pilots).

Versions:

214A
Powered by a 2,185kW (2,930 shp) Lycoming LTC4B-8D turboshaft engine, an improved version of the T55-L-7C fitted to the original Model 214A demonstrator when it went to Iran. It has the 1,528kW (2,050 shp) transmission and rotor drive system developed for the KingCobra experimental gunship helicopter and embodies Bell’s NodaMatic nodalised beam concept to minimise vibration. 296 delivered to the Iranian Imperial forces.

214B BigLifter
Commercial version of the 214A, announced on 4 January 1974, providing better lift capability than any commercial helicopter then in production. Powered by a 2,183kW (2,930 shp) Lycoming T5508D turboshaft, it has the same rotor drive and transmission system as the 214A. The engine is flat-rated at a maximum 1,677kW (2,250 shp) and the transmission at 1,528kW (2,050 shp) for take-off, with a maximum continuous power output of 1,379kW (1,850 shp). Advanced rotor hub with elastomeric bearings on the flapping axis; raked tips to main and tail rotors. Other features include an automatic flight control system with stability augmentation and attitude retention; nodalised suspension; separate dual-hydraulic systems; a large engine deck which serves as a maintenance platform; addition of an engine fire extinguishing system; push-out escape windows in the cargo doors, and commercial avionics.

214B-1
As 214B, but with restricted internal gross weight of 5,669kg (12,500 lb).

214C
Search and rescue variant of 214A. Total of 39 delivered to Iran.

214ST
Stretched twin-engined military version originally developed for production and service in Iran; but later transformed into commercial transport.

Specifications:

Bell Model 214B
Engine: 1 x Avco Lycoming T5508D turboshaft, 2185kW, 2050 hp
Main rotor diameter: 15.24m
Disc loading: 7 lb/sq.ft.
Pwr loading: 4.7 lb/hp.
Take-off weight: 6260k g / 13,800 lb
Empty wt: 7696 lb
Equipped useful load: 6059 lb.
Payload max fuel: 3595 lb.
Range max fuel/ cruise: 223 nm/ 1.5 hr.
Range max fuel / range: 256 nm/ 2.0 hr.
Service ceiling: 20,000 ft.
Max cruise: 146 kt.
Max range cruise: 131 kt.
ROC: 2280 fpm.
HIGE: 15,200 ft.
HOGE: 10,700 ft.
Max sling load: 8000 lb.
Standard fuel capacity 772 litres
Max fuel aux tank: 1,434 litres.
Accommodation: One or two pilots and 14 to 15 passengers.

Bell Model 214ST Super Transportghts
Engine: 2 x General Electric CT7-2 turboshaft, 1212kW, 1195 shp
Rotor diameter : 52.165 ft / 15.9 m
No. Blades: 2.
Disc loading: 8.2 lbs/sq.ft.
Power loading: 5.4 lbs/hp
Max take off weight : 17507.7 lb / 7940.0 kg
Weight empty : 10143.0 lb / 4600.0 kg
Max ramp weight: 17,500 lbs
Max useful load: 7987 lbs.
Max landing weight: 17,500 lbs.
Max sling load: 8000 lbs.
Length with rotors turning: 18.95m / 62.1 ft
Fuselage length : 50.197 ft / 15.3 m
Height : 15.748 ft / 4.8 m
Max. speed : 140 kt / 259 km/h
Normal cruise @ 3000 ft: 139 kts.
Fuel flow @ normal cruise: 906 pph.
Endurance @ normal cruise: 3 hr.
Initial climb rate : 1771.65 ft/min / 9.0 m/s
Service ceiling : 12598 ft / 3840 m
Hover in ground effect: 7800 ft
Range : 463 nm / 858 km
Hovering ceiling, IGE: 3170m
Fuel capacity : 435 gal / 1647 l
Crew : 2
Passengers : 18

Bell 214ST

Bell 208 / 212 / UH-1N

In 1964, the conversion of a standard UH-1D to a twin-engined configuration was funded by Bell. Work was done in Fort Worth, and by the spring of 1965, the prototype Model 208 Twin Delta was ready to fly. Its powerplant comprised two Continental T72-T-2 Model 217 turbo-shafts mounted side by side and driving, via a combining gearbox, a single output shaft. Designated XT67-T-1, this powerplant offered 1,240shp for take-off. The maiden flight was made on 29 April, 1965.

On 1 May 1968 the Bell Helicopter Company announced that following negotiations with the Canadian government and Pratt & Whitney Aircraft of Canada, it had been agreed to proceed with the development of a new helicopter based upon the airframe of the Bell Model 205/ UH-1H Iroquois, of which the first of 10 for the Canadian Armed Forces (CAF) had been delivered on 6 March 1968 under the designation CUH-1H. Power-plant of the UH/CUH-1 consisted of a 1044kW Avco Lycoming T53-L-13 turboshaft engine. The CAF considered that the incorporation of twin turboshaft engines would provide a number of benefits, and this led to development of the initial military Bell Model 212 and the Pratt & Whitney Aircraft of Canada (PWAC) PT6T power-plant for it. This programme was initiated as a joint venture, financed by Bell, the Canadian government and PWAC.

The PT6T Twin-Pac designed and developed by PWAC, consisted of two turboshaft engines mounted side-by-side and driving, via a combining gearbox, a single output shaft. This had an output in its initial production form of 4.66kW/kg, compared with 4.19kW/kg for the already-developed Lycoming T53 turboshaft. As installed in the Model 212 the PT6T-3 is limited to an output of 962kW for takeoff. In the event of a failure of one of the two turbines, sensing torquemeters in the combining gearbox signal the remaining turbine to develop a power output ranging from 764kW to 596kW, for emergency and continuous operation respectively.

Initial deliveries of military Model 212s were made to the USAF in 1970.

This variant, known as Model 212, was to have a two-blade all-metal semi-rigid rotor, and accommodate a pilot and up to fourteen passengers and, in its military variant, armament could include 7.62mm MAG pod machine-gun systems, 70mm air-to-ground rocket launchers (7 or 19 rounds), side-mounted 12.7mm or 7.62mm machine-guns.
The airframe is generally similar to that of the UH-1H Iroquois, with an all-metal fuselage structure, and skid landing gear.
A 14-passenger commercial version known as the Twin Two-Twelve was developed more or less simultaneously, this differing from the military model primarily in its cabin furnishing and avionics equipment. The Twin Two-Twelve gained FAA Transport Type Category A certification on 30 June 1971, and the type has since gained certification for IFR operation, requiring a new avionics package, new instrument panel, and stabilisation controls for such use. On 30 June 1977 it became the first helicopter to be certificated by the FAA for single-pilot IFR operation with fixed floats.

Bell 212

In June 1980, an improved variant of the PT6T-3, the PT6T-3B, was introduced which besides giving more power (1,800shp), also offered improved single-engine performance.

In mid-1988, producton of the Model 212 was transferred to Bell’s Canadian factory.

The order for a first batch of fifty helicopters was placed by the Canadian Armed Forces (under designation CUH-1N, later modified to CH-135) and the first Model 212 flew in April 1969. More orders soon followed, both civil and military: seventy-nine UH-1Ns for the US Air Force; forty UH-1Ns for the US Navy and twenty-two UH-1Ns for the US Marine Corps; 159 more being ordered later by the US Navy and Marine Corps.
The enhanced safety offered by the Twin-Pac powerplant has resulted in many sales to operators who provide support to offshore gas/oil prospecting and production companies, as well as to air taxi organisations. Eight Model 212s were delivered to the Civil Air Authority of China during 1979, and were the first helicopters supplied to the People’s Republic of China by a US manufacturer.

Bell 212

The 212 features an all-metal two-blade semi-rigid teetering main rotor with interchangeable blades; underslung feathering axis head; rotor brake optional. Fully powered hydraulic controls; gyroscopic stabiliser bar above main rotor; automatic variable incidence tailplane; IFR versions have large fin above cabin to improve roll-yaw responses during manual instrument flying. The metal main rotor blades have extruded aluminium nose sections and laminates; glass fibre safety straps provide redundant load path; fuselage conventional light metal. Tubular skid type. Lock-on ground handling wheels, high skid gear, fixed floats and emergency pop-out nylon float bags optional. Pratt & Whitney Canada PT6T-3B Turbo Twin-Pac, comprising two PT6 turboshafts coupled to combining gearbox with single output shaft. Engine rating 1,342kW for T-O, 1,193kW maximum continuous; OEI rating 764kW for 2.5 minutes, 723kW for 30 minutes. Transmission rating 962kW for T-O, 846kW maximum continuous and 764kW OEI. Five interconnected rubber fuel cells, total usable capacity 818 litres. Two 76 or 341 litre auxiliary fuel tanks optional, to provide maximum possible capacity of 1,499 litres. Single-point refuelling on starboard side of cabin. Oil capacity 11.5 litres for engines, 8.5 litres for transmission. Pilot and up to 14 passengers. Dual controls optional. In cargo configuration, has total internal volume of 7.02 cu.m, including baggage space in tailboom, capacity 181kg. Forward-opening crew door each side of fuselage. Two doors each side of cabin; forward (jettisonable) door hinged to open forward, rear door sliding aft. Accommodation heated and ventilated.

The 212 has been manufactured under license in Italy by Agusta as the Agusta-Bell AB.212, who built a demonstration prototype in 1971, initially in a civil configuration for VIP transport, but later transformed into a military configuration (corresponding to the UH-1N). These are generally similar to the American-built aircraft, but Agusta has developed an ASW version designated AB.212ASW. Structural strengthening took place, plus the provision of deck restraint gear, and the PWAC PT6T-6 Twin-Pac turboshaft rated at 1398 kW for take-off. This version has been exported to Greece, Turkey, Peru, and Spain. Distinctive features of the AB-212 antisubmarine helicopter include a special anticorrosive treatment for the powerplant, a search radar housed in a dome on the cabin roof, special electronics, sonar, antisubmarine and antiship armament, consisting either of two Mk.44 antisubmarine torpedoes, two AS-12 missiles, or two antiship missiles, depth charges and flares. The crew consists of two pilots and two operators. The Italian Air Force became interested in the Agusta AB-212 and acquired a few for air base rescue services.

Inside an 18-place Super Transport are wide and comfortable seats with adequate hip room and shoulder room. The cabin design provides superb passenger visibility.

The 212 has also been fitted with a four-blade rotor with redesigned blades. This variant, designated Model 412, has been in production in the USA and Italy since 1981. The four-blade rotor can also be fitted to the old 212s.

The US Marine Corps flies the VH-1N as a dedicated VIP transport.

The US Navy unit VXE-6 operates about six bright-red UH-1Ns in the Antarctic. In 1972, a UH-1N dropped a parachutist over McMurdo Sound, Antarctica for a record jump of 6247m.

100 UH-1N were to be rebuilt and upgraded to the UH-1Y configuration.
The UH-1Y and AH-1Z feature zero-time airframes and 85% commonality, including two GE-T700 turboshafts, glass cockpits, four-blade all-composite main rotors and tail rotors, drive train, and hydraulic and electrical systems.

Gallery

Versions:

CH-135
Canadian version, originally CUH-1N. Total 50 delivered 1971/72.

UH-1N
US Air Force, Navy and Marines version. Total 320 delivered.

UH-1Y
Dynamic and avionics upgrade.

Twin Two-Twelve
Civil version; first flight 16 April 1969; FAA certification 30 October 1970; FAA Category A transport certification 30 June 1971; IFR certification granted by FAA, UK CAA, Norwegian DCA and Canadian DoT; first-ever single-pilot IFR certification with fixed floats granted June 1977.

Bell212ST

AB212
Agusta-built version.

AB212ASW
Agusta-built version for anti-submarine warfare.

Specifications

Bell 212
Engine: 1 x Pratt & Whitney (UACL) PT6T-3 Turbo Twin Pac, 1800 shp (flat rating 1250 shp)
Rotor diameter: 48 ft 2.25 in / 14.69 m
Fuselage length: 42 ft 4.75 in / 12.92 m
Empty weight: 5549 lb / 2517 kg
MTOW: 11,200 lb / 5080 kg
Max speed SL: 109 kt / 126 mph / 203 kph
Max ROC SL: 1745 fpm / 532 m/min
Service ceiling: 17,400 ft / 5305 m
Max range SL, no res: 237 nm / 273 mi / 439 km
Crew: 1
Passenger capacity: 14
Interal cargo: 220 cu.ft / 6.23 cu.m
Internal load: 5000 lb / 2268 kg

212 Twin
Engine: 2 x P&W PT6T-3B coupled, 900 shp.
TBO: 2500 hrs.
Main rotor: 48 ft / 14.69m
Seats: 15.
Length: 57.3 ft. / 17.46m
Height: 13.1 ft / 4.53m
Max ramp weight: 11,200 lbs.
Max takeoff weight: 11,200 lb / 5080kg
Standard empty weight: 6143 lb / 2786kg
Max useful load: 5057 lbs.
Max landing weight: 11,200 lbs.
Max sling load: 5000 lbs.
Disc loading: 6.2 lbs/sq.ft.
Power loading: 6.2 lbs/hp.
Max usable fuel: 1455 lbs.
Max rate of climb: 1420 fpm.
Service ceiling: 14,200 ft / 4330m
Hover in ground effect: 11,000 ft.
Max speed: 100 kts.
Normal cruise @ 3000 ft: 100 kts.
Fuel flow @ normal cruise: 650 pph.
Endurance @ normal cruise: 2 hr.
Range: 420km

UH-1N
Engine: 1 x P&WC PT6T-3B Twin Pac.
Instant pwr: 1341 kW.
Rotor dia: 14.69 m.
MTOW: 5,084 kg.
Payload: 2260 kg.
Max speed: 121 kts.
Max cruise: 115 kts.
Max range (no reserve): 512 km.
HIGE (@MAUW): 4750 ft.
Service ceiling: 12,500 ft.
Crew: 1.
Pax: 14.

AB.212 ASW/ASV
Engine: 1 x 1,875 shp (1398 kW) Pratt & Whitney Canada T400 (PT6T 6) Turbo Twin Pac with two gas turbine power sections.
Instant pwr: 1342 kW.
Rotor dia: 14.63 m (48 ft 0 in).
Rotor disc area 173 9 sq.m (1,872.0 sq ft).
Fuselage length: 12.9 m.
Length overall 17.40 m (57 ft 1 in)
Height 4.53 m (14 ft 10¼ in).
No. Blades: 2.
Empty wt: 3420 kg (7,540 lb).
MTOW: 5070 kg (11,176 lb).
Payload: 2335 kg.
Max speed: 130 kts.
HIGE: 3200 ft.
HOGE: 1300 ft.
ROC: 396 m/min.
Fuel cap: 1350 lt.
Range: 582 km.
Max range with auxiliary tanks (no reserve) 667 km (414 miles).
Crew: 3/4.
Armament: two Mk 46 AS torpedoes or two depth charges or two anti ship missiles.

Bell 209 / AH-1 HueyCobra / SuperCobra / 249 / 309

AH-1W SuperCobra

In March 1965, Bell initiated company-funded development of the proven Model 204 (UH-1B/-1C Iroquois) to produce an armed helicopter suitable for close-support/attack roles. Intended to provide the US Army with an interim AAFSS (advanced aerial fire support system) helicopter, it combined a new narrow, low-profile, tandem-seat fuselage with the rotor / transmission system / powerplant and tailboom of the UH-1C. First flown in prototype form on 7 September 1965, the new Bell Model 209 was evaluated by the US Army from December of that year, with orders for two pre-production and 110 production aircraft following during April 1966. Initially a 1400 shp Avco Lycoming T53 L 13 turboshaft engine was used to power the Army’s first production version, designated AH-1G, and named HueyCobra, the type was first delivered to the US Army in June 1967, and within two months the type was being used operationally in Vietnam. US Marine Corps interest in this helicopter resulted in 38 AH-1Gs being supplied from the US Army production line in 1969, pending initial deliveries of 49 of the AH-1J SeaCobra variant ordered by the US Marine Corps in May 1968. Examples generally similar to the US Army’s AH-1G have been supplied to the Spanish navy (eight, designated Z.14) and Israel (six).
The HueyCobra has small stub-wings that serve the dual purpose of offloading the rotor in flight, and of carrying armament that, in the case of the AH-1G, can include folding-fin rockets or Minigun pods. Additionally, this version mounts beneath the nose an M-28 turret that can house two Miniguns, or two 40-mm grenade-launchers, or one of each. Armour protection is provided for the crew in the form of Noroc side panels and seats, with other vital areas of the helicopter protected by panels of the same mat-erial.
The Cobra features Kaman composite blades, fitted from 67th AH-1P onwards, tolerate hits by 23mm shells, have tungsten carbide bearing sleeves and outer 15% of blade is tapered in chord and thickness; tailboom strengthened against 23mm hits; airframe has infra-red suppressant paint finish. IR suppression nozzle on AH-1F. Flat-plate canopy has seven planes of viewing surfaces, designed to minimise glint and reduce possibility of visual detection during nap of the earth (NOE) flying; it also provides increased headroom for pilot. Improved instrument layout and lighting, compatible with use of night vision goggles. Improved, independently operating window/door ballistic jettison system to facilitate crew escape in emergency.

Bell AH-1 Cobra Article

The Cobra was armed with an M65 system with eight Hughes TOW missiles, disposed as two two-round clusters on each outboard underwing station. Inboard wing stations remain available for other stores. M28 (7.62/40mm) turret in earlier HueyCobras replaced by new electrically powered General Electric universal turret, designed to accommodate 20mm weapon and improve standoff capability, although only 20mm M197 three-barrel cannon (with 750 rounds) mounted in this turret. Rate of fire 675 rds/min. Turret position is controlled by pilot or co-pilot/gunner through helmet sights, or by co-pilot using M65 TOW missile system’s telescopic sight unit. Field of fire up to 110degs to each side of aircraft, 20.5degs upward and 50degs downward. Also equipped with Baldwin Electronics M138 wing stores management subsystem, providing means to select and fire, singly or in groups, any one of five types of external 70mm rocket store. These mounted in launchers each containing 7 or 19 tubes, additional to TOW missile capability.

A US Army production version of the Hueycobra attack helicopter is the TOW-armed AH-1F (Model 209) with flat-glass canopy, laser rangefinder and tracker, low airspeed sensor, fire-control computer, Doppler navigation, nap-of-the-earth and secure communications, and infrared suppression and jamming. The fully upgraded AH-1F entered production with the 199th new-build AH-1S, following 100 AH-1S and 98 Up-Gun AH-1S. A more advanced version of the single turbine Model 209, which has the military designation AH 1S, was in production for the U.S.Army. Power was provided by a 1,800 shp Avco Lycoming T53 L 703 turboshaft engine, and in addition to airframe improvements there are advanced avionics and equipment to enhance the flexibility and capability of the armament which is deployed.

Bell AH-1F HueyCobra

378 earlier AH-lGs were fitted with TOW mis¬siles and designated Mod AH-1S (Modified). The JGSDF received its first AH-1F in December 1984, from a requirement for 54. Fuji is assembling these Hueycobras under licence.
First twin-engined Cobra was AH-1J SeaCobra, delivered from mid-1970. The AH-1J traded the single Lycoming T53 turboshaft for a Pratt & Whitney PT6T-3 TwinPac engine.

The AH-1W was substantially redesigned to take a pair of 3250shp General Electric T700 engines in which guise it was named “SuperCobra”.
The USMC took delivery of the first of 44 new AH-1W SuperCobras in March 1986. The AH-1W SuperCobra is a version of the US Marine Corps AH-1 SeaCobra attack helicopter, itself a twin-engined develop¬ment of the US Army’s single-engined AH-1 HueyCobra that first flew in September 1965 in direct response to the requirements of the Vietnam War. In 1980 Bell was loaned an AH-1T Improved SeaCobra, and this was re-engined with two T700-GE-700 turboshafts with a combined output of 3,200 shp (2,386 kW) for improved performance with a heavier and more diverse warload. The AH-1T+ “production” version comprised 44 AH-1T conversions with slightly more power, a new combining gearbox, and revised electronics including a head-up display for the pilot and an improved defensive suite. The type entered service in 1987 with the revised designation AH-1W, and provides the USMC with an advanced capability for support of beach-head operations from landing ships lying offshore. The 65 per cent increase in available power allows up to eight TOW or Hellfire missiles to be carried.

Bell AH-1W

The Bell Model 249 was an AH-1S fitted with a four-blade rotor, and was offered with TOW or HOT missile installations. A proto¬type Model 249 flew in December 1979, using a Model 412 rotor system. The original Model 209 prototype first flew on September 7, 1965.
Designations include Modified AH-1S, which covers 197 AH-lGs and the 93 AH-1Qs with upgraded gearbox, transmission, improved rotor, T53-L-703 engine, and TOW-capability; 100 generally similar Production AH-1S, being new production aircraft with advanced avionics, instrumentation, and systems; 98 Up-Gun AH-1S, generally as the Production AH-1S but with an improved turret and weapon management systems; and the Modernised AH-1S of which 126 new production aircraft have been ordered incorporating the improvements embodied in the other AH-1S aircraft, plus advanced nay/coin, avionics, and protection systems. These are now known as AH-1F to avoid confusion with other variants AH-1T Improved SeaCobra: generally improved version of the AH-1J, incorporating an uprated T400-WV-402 powerplant, the dynamic system of the Bell Model 214, and the fuselage lengthened by 1.09m (3ft 7 in); 57 built, and equipped for operation with TOW missiles AH-1W SuperCobra: new USMC version with two GE T700-GE-700 engines, producing 1260-kW (1,690-shp) each. Better protection and avionics are incorporated. Conversion applied to AH-1T aircraft Model 249: company designation of a Modernised AH-1S which was equipped and tested with an advanced four-blade main rotor as developed for the Bell Model 412.
The first two of an initial batch of five AH-1W SuperCobra ordered for the Turkish Army Aviation were delivered in July 1990. They were powered by GE T700-GE-401 turboshafts.

Building a HueyCobra requires 38,500 hours of factory-worker time.

The Bell 209 Super Cobra features a stepped tandem seating and stub-wings for armament. Two-blade main rotor, similar to that of Bell 214, with strengthened rotor head incorporating Lord Kinematics Lastoflex elastomeric and Teflon-faced bearings. Blade aerofoil Wortmann FX-083 (modified); normal 311 rpm. Tail rotor also similar to that of Bell 214 with greater diameter and blade chord; normal 1,460 rpm. Rotor brake standard. Stub-wings have NACA 0030 section at root; NACA 0024 at tip; incidence 14degs; sweepback 14.7degs. AH-1Z will incorporate new four-blade rotor system and transmission.
Main rotor blades have aluminium spar and aluminium-faced honeycomb aft of spar; tail rotor has aluminium honeycomb with stainless steel skin and leading-edge. Airframe conventional all-metal semi-monocoque.
Non-retractable tubular skid type on AH- 1W. Ground handling wheels optional.
Two General Electric T700-GE-401 turboshafts, each rated at 1,285kW. Transmission rating 1,515kW for take-off; 1,286kW continuous; AH-1Z transmission flat rated at 1,957kW, Fuel (IPS) contained in two interconnected self-sealing rubber fuel cells m fuselage, with protection from damage by 12.7mm ballistic ammunition, total usable capacity 1,128 litres; AH-1Z has larger stub-wings, containing 379 litres of additional fuel. Gravity refuelling point in forward fuselage, pressure refuelling point in rear fuselage. Provision for carriage on underwing stores stations of two or four external fuel tanks each of 291 litres capacity; or two 379 litre tanks; or two 380 and two 290 litre tanks; large tanks on outboard pylons only. Oil capacity 19 litres.
Crew of two in tandem, with co-pilot/ gunner in front seat and pilot at rear in AH-1W; crew stations are interchangeable in AH-1Z. Cockpit is heated, ventilated and air conditioned. Dual controls; lighting compatible with night vision goggles, and armour protection standard. Forward crew door on port side and rear crew door on starboard side, both upward-opening. Inflatable body and head restraint system by Simula of Phoenix, Arizona, nearing end of development in mid-1995; retrofit provisions installed in 1996 production, with system incorporated in 1997 production.
Electrically operated General Electric undernose A/A49E-7(V4) turret housing an M197 three-barrel 20mm gun. A 750-round ammunition container is located in the fuselage directly aft of the turret; firing rate is 675 rds/min; a 16-round burst limiter is incorporated in the firing switch. Either crew member can fire the gun, which can be slaved to a helmet-mounted sight/aiming device. Gun can be tracked 110degs to each side, 18degs upward, and 50degs downward, but barrel length of 1.52m makes it imperative that the M197 is centralised before wing stores are fired. Underwing attachments for up to four LAU-61A (19-tube), LAU-68A, LAU-68A/A, LAU-68B/A or LAU-69A (seven-tube) 70mm Hydra 70 rocket launcher pods; two CBU-55B fuel-air explosive weapons; four SUU-44/A flare dispensers; two M118 grenade dispensers; Mk 45 parachute flares; or two GPU-2A or SUU-11A/A Minigun pods.
Provision for carrying totals of up to eight TOW missiles, eight AGM-114 Hellfire missiles, two AIM-9L Sidewinder or AGM-122A Sidearrn missiles, on outboard underwing stores stations. Canadian Marconi TOW/ Hellfire control system enables AH-1W to fire both TOW and Hellfire missiles on same mission.

AH-1W Upgrades: Following abandonment of the proposed Integrated Weapon System (IWS) project in July 1995 and the Marine Observation and Attack Aircraft programme which was intended to provide a replacement for both the AH-1W SuperCobra and the UH-1N Iroquois, the US Marine Corps has opted for a two-stage upgrade of the AH-1W, allowing it to be retained in the active inventory until about 2030. Phase 1 concerned installation of a Night Targeting System (NTS), under which USMC AH-1Ws fitted with the Israeli Tamam laser NTS for dual TOW/Hellfire day, night and adverse weather capability. Conversion of a prototype (162533) was authorised in December 1991, with an initial batch of 25 sets being built by Tamam for delivery from January 1993; joint production with Kollsman was approved in May 1994. A total of 250 sets was required by the USMC, with further sets produced for Turkey and Taiwan. Deliveries of modified aircraft to operational units of the USMC began in June 1994.
A further improvement programme, involving installation of an Embedded Global Positioning System/ Inertial Navigation System (EGI), has been undertaken. Two prototype conversions (162532 and 163936) were delivered to test units for trials in November 1995 and March 1996, with EGI installed on new-build aircraft from Lot 9 onwards, as well as older AH-1Ws as a retrofit programme.
Phase 2 entails installation of the Bell 680 four-blade rotor, offering a 70% reduction in vibration; formerly designated AH-1W, but now known as AH-1Z. Initial trials of the four-blade rotor system were undertaken with AH-1W 161022; bench testing of the new drive system began in second quarter of 1999 and was completed in first quarter of 2000. Bell also demonstrated 30-minute run-dry capability of new intermediate and tail rotor gearboxes in Match 2000. The AH-1Z will be fitted with a new four-blade, all-composites, hingeless/ bearingless rotor system; four-blade composites tail rotor; a new transmission rated at 1,957kW; endplates on horizontal tail surfaces and new wing assemblies able to carry twice the number of anti-armour missiles, as well as more fuel and additionally permitting concurrent carriage of two air-to-air self-defence missiles. Lockheed Martin selected to develop and manufacture AN/AAQ-30 Hawkeye advanced target sighting system (TSS), with work on US$8 million, 54 month, engineering development and integration programme beginning in July 1998. TSS features imaging technology by Wescam of Canada and Lockheed Martin’s Sniper third-generation FLIR, as well as colour TV camera, laser ranger, spottracker and designator.
Also to feature on the AH-1Z are ‘glass cockpits’, Northrop Grumman (formerly Litton Industries) has been selected as prime contractor for this aspect of the upgrade. Digital transfer of information on tactical situation, weaponry and flight data will enable crew interchangeability and allow AH-1Z to be flown from either front or rear seat, Major subcontractors include Rockwell Collins, which will supply active matrix liquid crystal displays (AMLCDs); Smiths Industries (fire-control system); Meggitt Avionics (standby air data and inertial sensing devices); and BAE Systems (air data computers). Other elements of the upgrade include new stores management system, onboard systems monitoring, mission data loader, HOTCC (hands on throttle, collective and cyclic) controls, airborne target handover system and a new EW suite.
A US$310 million cost-plus-fixed-fee contract was awarded to Bell in November 1996, for design, development, fabrication, installation, test and delivery of three engineering development AH-1W SuperCobra Upgrade Aircraft. Assembly of first AH-1Z begun at Hurst, Texas, in April 1999, by which time 85% of drawings had been released, with design work due for completion by end of 1999. Initial AH-1Z (162549, c/n 59001) completed final assembly in second quarter of 2000 and moved to Bell Flight Research Center at Arlington, Texas, for installation of instrumentation and functional testing that included restrained ground running which was completed in October 2000. Formal roll-out at Arlington on 20 November 2000, with first flight following on 7 December; subsequently redesignated as NAH-1Z and may eventually adopt new identity of 166477. Second development aircraft (163933/166478, c/n 59002) was due to fly in 2001, but handling quality problems that emerged early in flight test programme necessitated redesign of horizontal stabiliser assembly and caused delav; this eventually flew for first time on 4 October 2002, having been forestalled by third development aircraft (162532/ 166479, c/n 59003), which made its maiden flight on 26 August 2002. By mid-November 2002, all three aircraft had accumulated 390 flight hours, demonstrating 296km/h cruise and 407km/h maximum speed. Programme includes flight test and evaluation at Patuxent River, Maryland, to where first AH-IZ was airlifted by C-5 Galaxy on 31 March 2001. Weapons testing will take place at Yuma Proving Ground, Arizona with other trials at China Lake, California. Operational Test and Evaluation (OT&E) due to begin in fourth quarter of FY03 and will mostly be conducted at Patuxent River. Testing of full-scale AH-IZ structural test article at Arlington began in April 2000; on 22 November 2002, significant milestone passed with completion of 20,000 hour fatigue life demonstration, but further fatigue and static loads evaluation to follow, with airframe also earmarked for survivabiliry assessment on completion of test duty. Finalisation of the cockpit upgrade design occurred in FY99, with first order for remanufacture due to be placed in FY04. IOC scheduled for 2007, with peak production rate requiring 24 AH-1Ws to be upgraded annually. Initial deliveries will be to HMT-303 at Camp Pendleton, California.
AH-1RO Dracula: Derivative of AH-1W for Romania, which intended to purchase initial batch of 96. Project abandoned by Bell in fourth quarter of 1999.
AH-1Z King Cobra: Version for Turkey, which plans to acquire 145 attack helicopters at cost of US$4 billion; bids for initial batch of 50 (including two prototypes) submitted by end 1997. Announcement of winning contender was expected at start of 1999 but deferred to mid-2000, following delays in flight evaluations of competing types. AH-1Z selected, with announcement made at Farnborough 2000 in late July, when revealed that initial batch of 50 to be purchased at approximate US$1.5 billion cost; contract signature was due in first quarter of 2001, but was delayed because of difficulties over indigenous production of key systems such as mission computer; subsequent concerns over cost caused further delay and contract still not finalised by end of 2002, although Bell remains optimistic that sale will go ahead. Licensed production expected to be undertaken in Turkey by TAI at Ankara; current plan stipulates follow-on batches of 50 and 45 helicopters.
ARH-1Z: Designation allocated to version unsuccessfully proposed for Australian Army Project Air 87 armed reconnaissance helicopter.
MH-1W: In April 1998, Bell revealed a reconnaissance, armed escort and fire support ‘multimission’ version of the SuperCobra under this designation. Evolved in response to a perceived need for armed helicopters to undertake anti-drug operations, marketing efforts principally aimed at Latin American countries, with presentations to Argentina, Brazil, Chile, Colombia and Venezuela. Configuration includes a nose-mounted sighting system, with a FLIRStar Safire FLIR sensor, laser range-finder, video recorder and automatic target tracker. Proposed weaponry includes a 20mm cannon as well as 12.7mm gun pods and up to four 70mm rocket pods, but excludes anti-armour missiles and air-to-air missiles.

AH-1

Bell rolled out the first production AH-1Z Super Cobra for the US Marines on 20 November 2000. It carries a 20 mm Gatling gun with 750 rounds. An upgrade program involved converting AH-1Ws to AH-1Zs.
The UH-1Y and AH-1Z feature zero-time airframes and 85% commonality, including two GE-T700 turboshafts, glass cockpits, four-blade all-composite main rotors and tail rotors, drive train, and hydraulic and electrical systems.

As of 2010, the United States Army retains 879 Cobras (models AH-1F, AH-1E, AH-1P, and AH-1S) whilst the United States Marine Corps utilizes 103 AH-1W SuperCobra models.

Gallery

Variants:

AH-1E / Up-gun AH-1S
Formerly Enhanced Cobra Armament System or Up-gun AH-1S; with AH-1P improvements plus universal 20mm gun turret (invariably fitted with long-barrel 20mm cannon); improved wing stores management system for 70mm rockets; automatic compensation for off-axis gun firing; 10 kVA alternator for increased power. A total of 98 new build aircraft delivered 1978-79. All remaining upgraded.

AH-1F / Modernised AH-1S
Fully upgraded TOW version, previously designated Modernised AH-1S; 149 manufactured for US Army in 1979-86, including 50 transferred to Army National Guard; also 378 AH-1Gs converted to full AH-1F standard between November 1979 and June 1982, including 41 TAH-1F trainers; improvements of AH-1P and AH-1E added, plus new fire-control system having laser range-finder and tracker, ballistics computer, low-airspeed sensor probe, Kaiser pilot’s head-up display, Doppler navigation system, IFF transponder, infra-red jammer above engine, hot metal and plume infra-red suppressor, closed-circuit refuelling, new secure voice communications, Kaman composite rotor blades.

AH-1G HueyCobra
Original version for the US Army, powered by a single 1,044kW Avco Lycoming T53-L-13 turboshaft, derated to 820kW for T-O and maximum continuous rating. Development contract for two preproduction aircraft placed 4 April 1966, followed on 13 April by an initial order for 110 aircraft plus long-lead-time spares, deliveries of which began in June 1967. Total production, including small number of export units came to 1,127. All surviving aircraft converted to AH-1F standard.

JAH-1G HueyCobra
one armament research aircraft which has been flown with the Hellfire air-launched missile, and multi-barrel cannon.

TH-1G HueyCobra
Designation of dual-control trainer (all AH-1 Cobras had dual controls) conversions from AH-1G by modification to add 2 hydraulic control servos to the front seat (Instructors position) cyclic control System. This gave the instruction the ability to override the back seat Student inputs to the cycle System. The original front seat controls were arm chair type which did not provide the leverage to override the back seat controls.

AH-1J SeaCobra
initial US Marine Corps version powered by a twin-turboshaft 1,342kW T400-CP-400 powerplant, a military version of the PT6T-3 Turbo Twin-Pac; this power unit incorporates two turbine engines, flat-rated to 820kW (1,100 shp) for continuous running, but with a take-off or emergency rating of 932kW (1,250shp); total of 69 delivered to USMC by early 1975 the last two being converted later as prototypes for the AH-1T, and 202 similar aircraft supplied to the Imperial Iranian Army Aviation from 1974, the US Army acting as purchasing agent. All USMC SeaCobras withdrawn.

AH-1P
First batch of 100 new-production TOW Cobras (formerly called Production AH-1S), delivered 1977-78, two becoming AH-1F prototypes; improvements include flat-plate canopy, upturned exhaust, improved nap of the earth (NOE) instrument panel, continental US (CONUS) navigation equipment, radar altimeter, improved communication radios, uprated engine and transmission, push/pull anti-torque control and, from 67th aircraft onwards, Kaman composite rotor blades with tapered tips.

AH-1Q HueyCobra
Interim anti-armour version for US Army, converted from AH-1G to fire Hughes TOW anti-tank missiles. Total of 92 converted; subsequently upgraded to Mod AH-1S standard.

AH-1R HueyCobra
version similar to AH-1G with a more powerful T53-L-703 turboshaft engine

AH-1S HueyCobra / AH-1S(MOD)
overall designation under which existing US Army AH-1 aircraft were updated to have TOW capability and incorporated other improvements, and of new production aircraft to the same or higher standard. current designations include Modified AH-1S, which covers 197 AH-1Gs and the 93 AH-1Qs with upgraded gearbox, transmission, improved rotor, T53-L-703 engine, and TOW-capability; 100 generally similar Production AH-1S, being new production aircraft with advanced avionics, instrumentation, and systems; 98 Up-Gun AH-1S, generally as the Production AH-1S but with an improved turret and weapon management systems; and the Modernised AH-1S of which 126 new production aircraft have been ordered incorporating the improvements embodied in the other AH-1S aircraft, plus advanced nav/com, avionics, and protection systems.
All versions designated AH-1S until March 1987, when new-build AH-1s allotted dormant UH-1 Iroquois suffixes AH-1P, AH-1E and AH-1F. 92 AH-1Qs (early TOW-capable AH-1G) upgraded by 1979; 87 AH-1Qs upgraded in 1986-88 with Textron Lycoming T53-L-703 engines, Kaman rotor blades (see AH-1P) and TOW system, but retaining original curved canopies; total includes 15 in TH-1S Night Stalker configuration for training AH-64 crews to operate night vision system and Integrated Helmet and Display Sighting System (IHADSS).
These are now known as AH-1F to avoid confusion with other variants AH-1T

AH-1T / Improved SeaCobra
Generally improved version of the AH-1J for US Marine Corps, incorporating an uprated T400-WV-402 powerplant (1,469kW), the dynamic system of the Bell Model 214, and the fuselage lengthened by 1.09m; 57 built, and equipped for operation with TOW missiles. Last two AH-1Js modified as prototypes under a US Army Aviation Systems Command contract, with uprated components for significantly increased payload and performance. Incorporates features of AH-1J airframe, but embodies dynamic system of Bell Model 214, some technology developed for Bell Model 309 KingCobra, an upgraded power plant and transmission capable of transmitting the full rated engine power. Initial contract for 10 announced 23 June 1975; total of 57 built, of which 51 were subsequently modified to TOW configuration. First AH-1T flew 20 May 1976, and was delivered to US Marine Corps 15 October 1977. All have been converted to AH-1W SuperCobra standard.

AH-1W SuperCobra
Bell flew AH-1T powered by two GE T700-GE-700; first flight of improved AH-1 T+, including GE T700-GE-401 engines, 16 November 1983. New USMC version with two GE T700-GE-700 engines, producing 1260kW each. Better protection and avionics are incorporated. Conversion applied to AH-1T aircraft
USMC received 169 new-build examples as well as two maintenance trainers; 10 supplied to Turkey and 63 to Taiwan. Missions of AH-1W include anti-armour, escort, multiple-weapon fire support, armed reconnaissance, search and target acquisition.

Model 249
company designation of a Modernised AH-1S which was equipped and tested with an advanced four-blade main rotor as developed for the Bell Model 412

Specifications:

AH-1F Cobra
Engine: 1 x Textron Lycoming T53-L-703 turboshaft, 1,800shp
Main rotor: two-blade
Length: 44.59ft (13.59m)
Width: 44.00ft (13.41m)
Height: 13.42ft (4.09m)
Empty Weight: 6,598lbs (2,993kg)
Maximum Take-Off Weight: 9,998lbs (4,535kg)
Maximum Speed: 141mph (227kmh; 123kts)
Maximum Range: 315miles (507km)
Rate-of-Climb: 1,620ft/min (494m/min)
Service Ceiling: 12,198ft (3,718m)
HIGE: 12,200 ft
Armament: 1 x General Electric nose mounted three barrel 20mm gun
Accommodation: 2
Hardpoints: 4

AH-1G Huey Cobra
Engine : Lycoming T53-L-13, 1381 shp
Rotor dia: 44 ft 0 in (13.41 m)
Length: 52 ft 11.5 in (16.14 m)
Height: 13 ft 5.5 in (4.1 m)
Max TO wt: 9500 lb (4309 kg)
Max level speed: 219 mph (352 kph)
Fuel capacity: 980 litres.
Service ceiling: 12697 ft / 3870 m
Range: 336 nm / 622 km
Crew: 2
Armament: 2x Minigun(7,62)/GrenadeLauncher(40)], 4 St. 750kg

AH-1J SeaCobra
Engine: one 1342-kW (1,800-shp) Pratt & Whitney Aircraft of Canada T400-CP-400 twin-engined turboshaft
Maximum speed at sea level: 333 km/h (207 mph)
Hovering ceiling in ground effect: 3795m (12,450 ft)
Range with maximum fuel: 577 km (359 miles)
Empty operating weight: 3294 kg (7,261 lb)
Maximum take-off: 4535 kg (10,000lb)
Main rotor diameter: 13.41 m (44ft )
Tail rotor diameter: 2.59m (8ft 6 in)
Length rotors turning: 16.26m (53ft 4in)
Height: 4.15m (13ft 8in)
Main rotor disc area: 141.26 sq.m (1,520.53 sq ft)
Armament: one M-197 three-barrel 20-mm cannon in undernose turret, and up to 998 kg (2,200 lb) of weapons (XM-18 Minigun pods, XM-157 seven ¬tube or XM-159 19-tube 70-mm/2.75-in rocket pods) on four underwing racks.

AH-1S
Engine: 1 x Avco Lycoming T53-K-703 turboshaft, 1342kW
Main rotor diameter: 13.41m
No. Blades: 2
Length with rotors turning: 16.18m
Fuselage length: 13.59m
Width: 0.99m
Height: 4.09m
Empty wt: 2995 kg
Max take-off weight: 4535kg
Fuel cap: 1015 lt
Max cruising speed with Tow misiles: 227km/h
Max rate of climb: 8.22m/s
Hovering ceiling, OGE: 3720m
Range: 510 km
Crew: 2

AH 1T SeaCobra
Engine: Pratt & Whitney Aircraft of Canada T400 WV 402 twin turbine, 2,050 shp
Rotor dia: 48 ft 0 in (14.63 m)
Gross weight: 14,000 lb / 6350 kg
Max speed: 207+ mph / 333+ kph

AH-1W SuperCobra
Engines: 2 x General Electric T700-GE-401 turbo-shafts, 1,690 shp (1 260 kW) combined total of 3,250 shp (2,423 kW).
Maximum speed 152 kt (282 km/h) at sea level
Max cruising speed: 278km/h
Initial climb rate 800 ft (244 m) per minute on one engine
Service ceiling 14,000+ ft (4,270+ m)
Range 395 miles (635 km)
HIGE: 14,750 ft
HOGE: 3000 ft
Crew: 2
Empty weight: 10,200 lb (4,627 kg)
Maximum take-off weight: 14,750 lb (6,691 kg)
Main rotor diameter: 48 ft 0 in (14.63 m)
Length overall, rotors turning: 58 ft 0 in (17.68 m)
Fuselage length: 13.87m
Height: 14 ft 2 in (4.32 m)
Main rotor disc area: 1,809.56 sq ft (168.11 sq.m)
Armament: one 20-mm multi-barrel cannon, and provision for anti-tank and anti-radar missiles, rocket launchers, and submunition dispensers.